Water Works
Carib Territory Water Supply Project: Phase 1
The Carib Territory is a section of the island reserved for the indigenous Karifuna Carib Indians. In November 2006, the Dominica Water and Sewerage Company (DOWASCO) contracted JARS Sales and Services Co. Ltd. to build the infrastructure for water expansion in the area. The main component of the project required JARS to construct, in the village of Bataka, a reinforced concrete tank with the capacity to store up to 45,000 gallons of water. JARS also installed 11,000 ft of 4” Ductile Iron pipe to connect the newly erected water storage tank to the water mains in the neighboring village of Gaullette River. As part of the contract, we also set up a series of pressure reducing valves along the water network. This included the lining of an additional 2,000 ft of 6” PVC pipes and 800 ft of PVC mains at Bataka and Salybia respectively. |
 |
Carib Territory Water Supply Project: Phase 2
The Dominica Water and Sewerage Company (DOWASCO) also invited JARS to construct another reinforced concrete water tank and distribution network n the Carib Territory. This tank, erected in the village of Concord, is able to hold up to 15,000 gallons of water. JARS also ran a distribution line of 4” PVC pipes to connect the tank to the existing network and also installed fire hydrants at strategic locations throughout the community. |
 |
Watten Waven, Copthall and Trafalgar Water Supply Project
In February 2005, JARS Sales and Services Co. Ltd. was one of the major contractors on the upgrading of the water system that fed three communities in the south central part of Dominica. DOWASCO employed the company to replace the asbestos pipeline at Watten Waven with a distribution line that utilized 4” PVC pipes. JARS Sales and Services Co. Ltd. also laid a 6” ductile iron pipeline to feed a 60,000 gallon water tank at Copthall. Under the same project, the company also put in a 3” galvanized line that connected the 6” pipeline at Watten Waven to the water tank at Trafalgar. |
 |
Belfast Housing Development Water System Extension
JARS Sales and Services Co. Ltd. and Activille Tavernier and Associates installed 2000 ft of pipe, including fire hydrants, for upgrading the water system in the Belfast Housing Development. |
|
|
|
|
 |